LONGJOY FITTINGS | HDPE hot melt butt tee

12
ModelLJ-PF032
CertificationISO9001
StandardDIN, ANSI, ASTM, GB
Place of OriginChina
PriceNegotiation
Payment TermsL/C, T/T
Supply AbilityAnnual output 50000 tons

Description

HDPE hot-melt butt tee and pipe connection adopt butt joint method. Hot melt butt welding is adopted for dn110 and above.

Hot melt connection method is a good method, which has the advantages of low cost, good quality of pipe interface and no pipe fittings.

The docking temperature is generally between 210-230 ℃, and the heating time of the heating plate is different in winter and summer. The melting length of both ends is 1-2mm.

Technical data sheet

Specifications D d I L H
Φ20 27.5 19 16.5 54.5 27.5
Φ25 33.5 24 18.5 63 31.5
Φ32 42.5 31 21 74 37
Φ40 53.4 39 22 86 43
Φ50 66.6 49 25 102 51
Φ63 83.5 61.9 29 123 61.5

Characteristic

HDPE hot melt butt tee and pipes of different materials and wall thickness shall not be mixed.

The end face of the connector must be kept clean and the attached water or dirt must be removed in time.

Before hot melt connection, the equipment shall be maintained and operated to ensure the service life of the equipment.

Application

Because of its unique advantages, HDPE hot melt butt tee is widely used in the fields of building water supply, building drainage and burnt drainage pipes

In addition, it is also used for building heating, gas pipelines, electrical and communication protection sleeves, industrial pipelines, agricultural pipelines, etc.

Scroll to Top